[Green] Harrison Construction quote for RE Building Hot Water plumbing changes project

Adeline Bailey adesign at suddenlink.net
Tue Aug 13 10:36:45 CDT 2019


Yeah, that's been sitting in the outbox from when things started to go downhill. Still not got all the links worked out, but it's better.

Sent from my Verizon Wireless 4G LTE DROID
On Aug 13, 2019 11:30 AM, Kelcey Jacobs via Green <green at fuusm.org> wrote:
>
> I received it Adeline.
> Kelcey
>
> On Tue, Aug 13, 2019 at 11:19 AM Adeline Bailey via Green <green at fuusm.org> wrote:
>>
>> Testing my email send function. Let me know if you get this.
>>
>> Sent from my Verizon Wireless 4G LTE DROID
>> On Aug 6, 2019 11:30 AM, Kelcey Jacobs via Green <green at fuusm.org> wrote:
>>>
>>> Sounds good to Chris and I.
>>> Kelcey
>>>
>>> On Tue, Aug 6, 2019 at 5:01 AM Ralph Olander via Green <green at fuusm.org> wrote:
>>>>
>>>> Yea, I say, though it will surely get us into hot water….
>>>>
>>>>> On Aug 4, 2019, at 5:55 PM, David Ballantyne via Green <green at fuusm.org> wrote:
>>>>>
>>>>> Dawn and Green Sanctuary Group,
>>>>>
>>>>> Building and Grounds Committee at their meeting this morning approved endorsement of Harrison Construction's current current quote proposal for the "RE Building Hot Water plumbing upgrade project."  Their endorsement means that the project meets their assessment of the technical aspects of the proposal for the needs of the RE Building, and they support you moving ahead with contracting for the project with Harrison Construction Inc..
>>>>>
>>>>> The quote is for $1840 for:
>>>>>>
>>>>>> Disconnect and cap lines to bypass the existing hot water tank system while leaving it in the RE basement for future decision on its disposal.  Provide and install two (2) new "on demand" 110 V hot water units in the bathroom and at the kitchen sink.  Includes all required wiring, breakers and plumbing pipe parts.  Included any adjustments required at the sink locations.  Clean up and haul all related work site debris - except for the hot water tank.
>>>>>
>>>>>
>>>>>> Includes donation of a sink, cabinet and faucet fixtures for installation in the bathroom and all necessary associated plumbing parts.
>>>>>
>>>>>
>>>>> The project is intended to be funded by the Green Sanctuary Energy Efficiency Matching Fund. 
>>>>>>
>>>>>>
>>>>> Regards,
>>>>> Dave
>>>>> _______________________________________________
>>>>> Green mailing list
>>>>> Green at fuusm.org
>>>>> http://fuusm.org/mailman/listinfo/green_fuusm.org
>>>>
>>>>
>>>> _______________________________________________
>>>> Green mailing list
>>>> Green at fuusm.org
>>>> http://fuusm.org/mailman/listinfo/green_fuusm.org
>>
>> _______________________________________________
>> Green mailing list
>> Green at fuusm.org
>> http://fuusm.org/mailman/listinfo/green_fuusm.org
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://fuusm.org/pipermail/green_fuusm.org/attachments/20190813/a8e98bff/attachment.htm>


More information about the Green mailing list